Kingsport

During this complete remediation, Aptus cleaned, primed and wrapped143’ of 4” gas main with grey/silver wax tape, installed thirteen 6” hot-dipped galvanized yoke style hangers containing non-conductive rollers and allnew hardware, installed fiberglass shields at each hanger location and installed fill putty at the abutments. The pipe was then inspected to ensure no loss of wall thickness.